Company News
We are pleased to announce we have been awarded the following £800,000 contract:
A full turnkey package, the supply, fabrication, surface treatment and erections of a pair of 32 tonnes foundry sand moulding hoppers. This also includes the 40 tonnes of associated steel work.
The steelwork will be galvanised to BSEN 1461 and the hoppers will be painted with an undercoat and topcoat at our works. The roof of the hopper will be coated with a non-slip surface to allow for access.
All will be fully erected by the team at WPE.